Construction specialists / Since 1976Serving Canada and the United States

Delivery model

Trade Packages

Engage Eglinton for a defined scope within a larger project — as a trade partner to a general contractor, construction manager or owner.

  • Commercial
  • Multi-Residential
  • Hospitality
  • Celebrating 50 Years
  • Prime + trade delivery

The model

What a trade package means here

A trade package is a focused engagement. Eglinton delivers an agreed portion of a wider construction programme — for example millwork, architectural finishes, MEP coordination or envelope work — without taking prime responsibility for the whole project unless that is separately contracted.

When a trade package makes sense

Use this model when the rest of the project already has a lead contractor or a clearly bounded specialty scope.

  • A GC needs a trade partner

    The prime contractor wants a qualified package delivered inside their programme.

  • An owner needs a defined specialty

    A single division — finishes, millwork, MEP or similar — is the scope being awarded.

  • Fabrication plus installation

    Shop work and field installation need one accountable team for a bounded package.

  • Occupied or operating sites

    A limited interior or in-building package has to land around residents, guests or tenants.

  • Invite to bid

    You have a tender deadline, drawings and a package description ready for review.

How a package typically moves

Exact steps vary by division. The sequence below is a truthful outline, not a promise that every package follows it identically.

  • Scope review

    Read the package against drawings, specifications and site conditions.

  • Submittals and samples

    Shop drawings, product data or samples where the package requires them.

  • Procurement

    Materials and specialty items aligned to the approved details and lead times.

  • Preparation / fabrication

    Shop or prefabrication work when the scope includes it — not every division does.

  • Installation

    Field work sequenced with the GC or CM programme and other trades.

  • Deficiencies and handover

    Punch, documentation and turnover of the package to the lead contractor or owner.

Delivery process

From shop drawings to installation

Kept broad so it remains accurate across civil, structure, systems, millwork, finishes and envelope packages.

  1. Scope review

    Confirm inclusions, exclusions, interfaces and the documents we will work to.

  2. Submittals and samples

    Provide the information the consultant or GC needs before fabrication or install.

  3. Procurement

    Release materials against approved details and the project schedule.

  4. Preparation

    Shop fabrication or site prep where the selected division actually works that way.

  5. Installation

    Deliver the package on site inside the wider construction programme.

  6. Handover

    Close deficiencies for the package and turn it over to the lead team.

Built to fit the wider project

Trade packages are designed to sit inside someone else’s programme. We coordinate with the parties who already own the job.

  • General contractor or CM

    Schedule, access, hoisting, protection and reporting follow the lead contractor’s system.

  • Consultant team

    Submittals and RFIs go through the project’s established channels.

  • Other trades

    Interfaces — structure, MEP, finishes, envelope — are planned so the package can be installed cleanly.

  • Site logistics

    Deliveries and work areas respect occupied buildings and the host programme.

Our divisions

Select the scope you need

These are the current Eglinton divisions. Choose the package that matches your tender, then send drawings or an invitation to bid.

Commercial interior construction with coordinated trades on site

Division 01

Civil & Infrastructure

Site preparation, servicing and infrastructure scopes that establish a reliable base for building work.

  • Earthworks and grading
  • Site servicing
  • Utilities coordination
  • Roadworks and access
  • Environmental considerations

Featured projects

Featured projects

Image-led work across the markets we serve. Named case studies are published as owner-approved details become available.

  • Commercial interior with wood and glass finishes

    Commercial

    Offices, retail and tenant improvements

    Eglinton role
    Coordinated construction and trade delivery
    Scope
    Interior and building work for occupied and new commercial environments.
    View project
  • Multi-residential condominium building exterior

    Multi-Residential

    Condominiums and in-building improvements

    Eglinton role
    Coordinated construction and trade delivery
    Scope
    Suite, common-area and occupied-building work sequenced around residents.
    View project
  • Hospitality lounge interior

    Hospitality

    Hotels, restaurants and lounges

    Eglinton role
    Coordinated construction and trade delivery
    Scope
    Finish-sensitive interiors delivered around operating schedules.
    View project

Why Eglinton

Why award a package to Eglinton

The offer is a bounded, accountable scope inside a larger job.

  • A defined package, not the whole project

    You keep your GC or CM. Eglinton delivers the awarded division or specialty scope.

  • Division specialists on the documents

    Shop drawings, samples and installation follow the package — not a generic construction brochure.

  • Fits the host programme

    Access, sequence and reporting follow the lead contractor and consultant team already running the site.

Common questions

Common questions before you send a trade-package RFQ.

Can a trade package grow into general contracting?
Sometimes, if the owner later wants Eglinton to carry a wider scope. That is a separate conversation and a different contract — not an automatic upgrade.
Which divisions can be bid as a package?
Civil and infrastructure, structural, MEP, millwork and fabrication, architectural finishes, and building envelope. Use the divisions on this page to choose the relevant scope, then send drawings or a bid invitation.
How do we invite Eglinton to bid?
Use Invite to Bid on the contact form. Include tender deadline, time zone, the package or trades, and a link to drawings. Treat documents as private project information.

Have a defined scope to price?

Invite Eglinton to review your trade package. Share location, drawings and the tender deadline.